Pulled all this crap out of the tumbler after 3 days and it looks great. I am replacing all the screws so there really isn’t that much metal to fix up. I’ve got all the rollover switches running now with the pop bumper rod and rings. In a couple of days all the metal will be tip-top.

Leave a Reply