The underside of the playfield is 99% complete. All the mechs are in and wires soldered. Gonna clean and wax the playfield before completing the flipper installation. I’ve taken this machine further than any other restore so far, though I won’t be doing much to the outside of the cabinet even though it’s a bit rough.



The next phases are going to go really slow because of the hunting and drilling game I’ll be playing, and I’m behind in metal polishing.
I should be playing taxi at home in a matter of weeks!
Leave a Reply